
Roofs that outlastthe trade winds.
Concrete roof slabs, waterproofing and full builds across Aruba, led by one crew from the pour to the last coat.
Book an inspectionWe pour concrete roof slabs, seal them, and build the houses underneath. One crew lead stays on your job from the first pour to the last coat, so the person who quoted the price is the person on the roof.
- years of written warranty
- 10
- hours to a written quote
- 48
- days for a typical roof seal
- 2
- hours to answer a leak call
- 24
Five kinds of job, one crew.
- Concrete roof slabsFormwork, steel and pour, propped until the slab carries its own weight.

- WaterproofingPrimer, membrane and a cured screed, with a written ten-year warranty.

- New villasFrom survey and drawings to the first night with the lights on.

- Terraces and poolsPergolas, decks and plunge pools built to sit with the house.

- Leak repairWe trace the leak, open it up, fix it and show you the photos.

Watch one lot go up.
Watch one lot go up.

Drawings and permitsPlan Every roof starts as lines on paper. We survey the lot, draw the slab once and price it before anyone lifts a tool.

Rebar and concreteFoundation Steel tied, slab poured, then the concrete gets the time it needs to cure.

Block and columnsWalls Reinforced columns and block, laid course by course the way houses go up on this island.

Formwork and pourRoof The slab is poured in one day and propped until it carries its own weight.

Seal and finishFinishes Membrane and screed go on before the paint does. Then stucco, glass and the pergola.

HandoverHome Lights on. The crew that poured the slab hands you the keys and the warranty.
You see the price before we touch the roof.
Two of us come with a camera and a moisture meter. We photograph what we find and go through the pictures with you on the spot.
Scope, materials and one price in writing within 48 hours. If the roof shows us more once it is open, we stop and ask before we spend your money.
One crew from start to finish. We cover your terrace and plants, keep the site clean and send a photo update each evening.
We walk the roof with you, hand over the warranty and the photo record, then come back after the first heavy rain to check.
Look closer at one house.
Point at a marker, or tap it. Each one is a place we check on every job.
Recent builds

Santa Cruz
Villa on a cunucu lot
A one-storey villa with a flat concrete roof, a timber pergola and a plunge pool.
- Roof
- Poured slab, three-layer membrane
- Build
- 9 months
- Warranty
- 10 years

Noord
A second storey, one pour
A family home gained a floor. The new slab went in on one long day with two pumps and the whole crew.
- Slab
- 15 cm, steel both ways
- Pour
- One day
- Cure before sealing
- 28 days

Savaneta
Terrace and plunge pool
A pergola, a stepped deck and a plunge pool, built so rain runs away from the house.
- Deck
- Non-slip finish
- Pool
- 6 by 3 metres
- Time
- 11 weeks
